    The different types of construction contract explained

    This article explains the different types of construction contract, and explains how to choose the right type of contract for your next project. Although the same general principles should apply ...

    read more

    What is a provisional sum?

    A provisional sum is an allowance included in a fixed price construction contract for an item of work that cannot be priced by the contractor at the time of entering the contract.

    read more

    10 differences between AS 4000 and AS 2124

    Both AS 2124 and its successor AS 4000 are widely used forms of construction contract in Australia. Although they have many similarities, there are some significant differences.

    read more

    Introduction to AS 2124

    The Australian Standard AS 2124-1992 General Conditions of Contract remains a widely used form of construct only head contract, despite it having been succeeded by AS 4000-1997 and now being ...

    read more

    What is the defects liability period (DLP)?

    The defects liability period (or 'DLP') is a fixed period of time, starting from the date of practical completion, during which the contractor has an express contractual right to return to the ...

    read more

    9 types of security under a construction contract

    When you think of performance security under a construction contract, cash retentions and bank guarantees come to mind. However they are not your only options.

    read more

    How to claim a variation under a construction contract

    Construction contracts usually contain specific procedures for claiming a variation - which, if not followed, can result in your entitlement to claim being lost. There are six basic steps to ...

    read more

    Introduction to AS 4000

    AS 4000, more formally known as the Australian Standard AS 4000-1997 General Conditions of Contract, is one of the most widely used forms of head contract for construction projects in Australia.

    read more

    Can contract notices be sent by email?

    With businesses conducting the majority of their day-to-day communications by email, it can be easy to assume that email will be a valid form of communication under a contract.  However that will ...

    read more

    What is Early Contractor Involvement (ECI) and how does it work?

    Early contractor involvement (or 'ECI') is a method of construction contracting that allows a builder to become involved, and potentially start work, before the design has been completed.

    read more

    10 things you should know about AS 4000

    Although AS 4000 is one of the most widely used construction contracts in Australia, many people remain unfamiliar with the detail. You can find our easy to understand explainer right here. The ...

    read more

    What is a fiduciary duty?

    A fiduciary duty exists where a person or company is required to put another person's interests before their own. It arises from a relationship of trust and confidence, such as the relationship ...

    read more